East Phoenix Mountain Mine Geological Environment Control Project in High-tech Zone Construction of Lianyungang High-tech Zone East Fenghuang Mountain Mine Geological Environment Control Project; Tender Notice

江苏-连云港-连云区 2019-03-02 Jiangsu-Lianyungang-Lianyun District
Area: Jiangsu-Lianyungang-Lianyun District Release date: March 2, 2019
Bidding Procurement Text

招标公告 Announcement on Tendering for Geological Environment Control Project of Dongfeng Mountain Mine in High-tech Zone

One, Tender conditions

   已经 市区 招标办 备案。 The geological environment treatment project of Dongfeng Mountain Mine in the High-tech Zone has been put on record in the urban bidding office . 连云港高新技术产业开发区南城街道办事处 ,工程所需资金来源 财政 The tenderer is Nancheng Sub-district Office of Lianyungang High-tech Industrial Development Zone , and the funds needed for the project are financed . 连云港高新区东凤凰山矿山地质环境治理项目施工 进行公开招标。 The project has been qualified for bidding. The public bidding for the construction of the geological environment treatment project of Dongfengshan Mine in Lianyungang High-tech Zone is now underway. 资格后审 方法选择合格的投标申请人参加投标。 In this tender, the qualifications of bidding applicants are reviewed, and qualified bidding applicants are selected to participate in the bidding by the post-qualification review method.

two, Project Overview and Tendering Scope

1. Construction site of this tender project:    Dongfeng Mountain, Nancheng Street

2. Project scale:    Adopt clear slope, cut slope and fill to carry out slope finishing, eliminate dangerous rock mass on the slope, and strengthen and restore the slope at the same time; arrange drainage drainage system at the slope top and slope foot, and use green isolation belt and retaining wall at the slope foot Protection, fill the earth, regreen, and eliminate the destruction of terrain and landscape

1 个标段 3. This announcement is divided into 1 bid section






Bid number Bid name Tender scope Construction period




3207061807170101-BD-001 Construction of Geological Environment Control Project of Dongfeng Mountain Mine in Lianyungang High-tech Zone Slope finishing, mountain greening and drainage facilities, see project quantity list and drawings for details 150 calendar days




three, Bidder qualification requirements

1. Qualification level and scope:                      

2. The qualification category and level of the project leader:                      

3. This tender does not accept consortium bids.

4. Other requirements:    Announcement of Bidding for Construction of Geological Environment Control Project of Dongfeng Mountain Mine in Lianyungang High-tech Zone

1. Tender conditions The bidding project for the East Phoenix Mountain mine geological environment treatment project in the high-tech zone has been approved by Lianyungang High-tech Industrial Development Zone Economic Development and Safety Supervision Bureau with Lianyungjing [2018] No. 107, and the project owner is Lianyungang High-tech Industry The Nancheng Sub-district Office of the Development Zone is financed by construction, and the project funding ratio is 100%. The project has already been eligible for bidding. The public bidding for the construction of the geological environment management project of Dongfengshan Mine in Lianyungang High-tech Zone is now open. Interested potential bidders are invited to participate in the bidding.
2. Project Overview and Tendering Scope
2.1 Project Overview
2.1.1 Construction site: East Phoenix Mountain, Nancheng Street
2.1.2 Construction scale: /
2.1.3 Controlling price: RMB 4770577.04
2.1.4 Duration requirement: 150 calendar days
2.1.5 Quality Standard: The quality of the project reaches the qualified standard
2.2 Scope of tendering: slope finishing, mountain greening and drainage facilities, see project quantity list and drawings for details
3. Bidder qualification requirements
3.1 The bidder must have Grade A qualification for geological disaster management construction issued by the Ministry of Land and Resources;
3.2 The person in charge of the project proposed by the bidder must possess senior professional titles of hydrogeology, engineering geology, environmental geology, and geotechnical engineering (one of the majors can be met);
3.3 This bidding project implements the requirements of the qualification review conditions of the Document No. [2017] No. 1 of Su Jianzhi. The qualification review of this bidding project adopts the qualification qualification post-review.
3.3.1 The following conditions are necessary for qualification review (that is, the bidders must be selected during the qualification review process, and the qualifications must meet at least the qualification requirements):
(1) Ability to independently conclude contracts and construction machinery, surveying, testing and quality testing equipment suitable for geological disaster prevention and control projects;
(2) The enterprise's qualification category, grade, and project leader's registered specialty and qualification grade meet the relevant national regulations;
(3) For bidding in the form of a consortium, the qualification (qualification) conditions of the consortium must meet the requirements of pre-qualification documents or bidding documents, and be accompanied by a common bidding agreement (the project does not accept consortium bidding);
(4) The enterprise has the conditions for production safety and has obtained a production safety license (except those not required by relevant regulations);
(5) The person in charge of the project must meet the following conditions:
a. After the project leader wins the bid, it will not affect the process of construction procedures and the project manager's duties.
b. The person in charge of the project has no record of criminal acts of bribery; or there is a record of criminal acts of bribery, but it has been more than 5 years since the date of recording.
(6) Bidders must not have any of the following situations:
a. It is a subsidiary organization (unit) whose bidder does not have the status of an independent legal person;
b. Supervisor, agent, project manager of the bidding project, and providing bidding agency and design services for the bidding project;
c. Those who are the same legal representative with the supervisor, agent, and bidding agency of this bidding project, or who hold or share each other;
d. There is an interest relationship with the bidder who may affect the fairness of the bidding;
e. The person in charge of the unit is the same person or different units with a controlling or management relationship;
f. Being in a state of being ordered to suspend business, property to be taken over, frozen and bankrupted, and bid qualifications to be cancelled or suspended and within the suspension period;
g. Due to arrears of workers' wages or quality and safety accidents, the relevant departments are restricted from undertaking projects at the location of the bidding project;
h. The bidder has committed a crime of bribery in the past 3 years and has been recorded, or the legal representative has a history of bribery and has not exceeded 5 years since the date of recording.
(7) Comply with other conditions stipulated by laws and regulations:
a. This project requires that the authorized agent of the bidder must be the person in charge of the project who intends to invest in the project (provide a power of attorney and a guarantee from the company for 6 consecutive months, from June 2018 to November 2018 (by The social security institution issues the social insurance payment certification materials, and stamps the social insurance institution's seal or the electronic insurance seal of the social insurance institution's participation payment certificate)));
b. The bidding work of this project is implemented by Lianqing Office (2011) No.9, Suqing Office [2011] No.13, Suqing Office [2012] No.14, Lianqing Office [2013] Document No.6, Suqing Office [2013] No. 10, Lianqing Office [2014] No. 4, Lianqing Office [2014] No. 16, Su Qing Office [2014] No. 5, Lianqing Office [2015] No. 6, Lianqing Office (2015) No. 9, Lianqing Office Office (2015) No. 15, Lianqing Office [2016] No. 2, Suqing Office (2015) No. 9, Suqing Office (2016) No. 7, Lianqing Office [2017] No. 5, Suqing Office [2017] 6 Documents such as No. 4 and Su Qing Office (2018) No. 4, all bidders and project managers appearing in the above documents, and applications that have not been lifted will not be accepted.
c. The implementation of the “Su Jianjianguan [2013] 572” document for the management of the inspection and filing of construction enterprises outside the province shall provide the “Certificate of Qualification of Construction Enterprises Outside the Province”;
d. The bidding for this project shall be implemented in accordance with Su Jianjian Guan (2013) No. 508, Su Jian Invitation Letter [2018] No. 17 and Lian Jianfa [2018] No. 421.
The bidder and the project leader have no market bad behaviors (the bad behaviors that should be during the publicity period), the project leader adopts the commitment method and does not affect the completion of engineering construction procedures after the bid is won The commitment includes: making a written commitment to its own credit status, the authenticity of the application materials, and its liability for breach of contract. The market's bad behavior is subject to the announcement of Jiangsu Construction Engineering Bidding Network. (For details, please refer to the "bidder's letter of commitment")
According to Su Jian's Proposal No. [2018] No. 17, bidders do not need to go to the procuratorate to inquire about bribery behaviors, they only need to commit themselves to bidders (more than 3 years), legal representatives (more than 5 years), and project leaders (more than 5 years). Bribery criminal record. (For details, please refer to the "bidder's letter of commitment")
e. The execution of this project Lian Jianfa [2018] No. 96 "Notice on Printing and Distributing the" Procedures for the Handling of Lianyungang City Construction Project Bidding and Demolition "; Lian Jianfa [2018] No. 95" About Printing and Distributing "About Strengthening the Tendering and Bidding of Construction Projects" "Notice on Management Opinions"; Su Credit Office [2018] No. 23 "Notice on Printing and Distributing the" Implementation Opinions on Establishing a Joint Disciplinary Mechanism for Unscrupulous Enforcers in Tendering and Bidding Activities in the Field of Public Resource Trading ".
f. This project implements the provisions of Su Jianjian Guan [2017] No. 236, Su Jianjian Guan [2016] No. 214 and the explanation of related issues. The bidding shall be carried out according to law. Except for the person in charge of the project, other site personnel shall not Then ask for clarity. When registering a construction contract, the project manager automatically imports the construction contract filing system along with the bidding system. Other key position personnel need to be selected in the company's registered (or filed) personnel database and automatically generated. Provide qualification title certificate of the project leader, labor contract, and social insurance payment certificate (certified by the social security institution, and affixed with the social insurance agency seal or the electronic insurance seal of the social insurance institution's participation payment certificate, and pay the social insurance at the unit during the qualification review. (Time from June 2018 to November 2018). Scans of the above originals must be entered into the Integrity Library.
3.3.2 The bidder and the person in charge of the proposed project shall have other requirements: /
3.3.3 Bidders shall not have the circumstances specified in Chapter 1.4.3 of the Bidding Documents.
3.3.4 If the bidder or other interested parties have any objection to the bid evaluation results, they shall raise an objection to the tenderer during the period of publicity of the bid evaluation results. Objections to the bid evaluation results of all bidders shall be raised during the publicity period. After the expiration of the publicity period, the winning bidder will be announced directly, and the tenderer and the supervisory authority will no longer accept objections and complaints about the winning bid or the postponement of the winning bid due to legal circumstances.
3.3.5 The implementation of Su Jianzhizi [2017] Document No. 1 in this project The bidders exhibited the following dishonesty behaviors in public bidding activities and publicized them for 1-3 months:
① Except for force majeure, prequalified bidders fail to obtain bidding documents or abandon bidding after obtaining bidding documents for no reason, or bidders cancel bidding documents for no reason after the deadline for bidding, etc., and publicize for 2 months;
② Submission of uncompetitive bidding documents (Uncompetitive bidding refers to bids that are not for the purpose of winning bids, including abnormally high bid prices, deliberate omissions in bidding documents, construction organization design documents that do not meet the length requirements, and intentional violations Invalid bidding terms that have been marked prominently in the bidding documents and have not been questioned beforehand), publicize for 1 month;
③ If the complainant deliberately fabricates the facts, falsifies the certification materials, or obtains the certification materials by illegal means to make a malicious complaint, it will be publicized for 3 months.
Note: According to Su Jianzhao [2015] No. 6, this project implements paperless electronic bidding and does not need to provide relevant original verification (except as required in the bidding documents). Participating bidders must complete their integrity database before bidding. All materials of the bidding unit must be entered into the integrity database, including business licenses, enterprise qualification certificates, enterprise safety production licenses, enterprise account opening licenses, project leader title certificates, labor contracts, social guarantees, and other relevant materials are clearly and completely uploaded and reviewed by the judges All evaluations are based on the relevant information in the integrity database. If the company's integrity database is incomplete, the uploaded scan is incomplete or cannot be clearly identified, it will be considered as invalid certification documents. The materials that can not be uploaded in the integrity database, such as the power of attorney of the project leader, the bidder's commitment, the provincial foreign capital quality verification letter, the relevant information of the confirmation letter of the exemption from the bid deposit issued by the Municipal Construction Bureau, etc. Attachment "and serve as the basis for review. If the uploaded certificate is incomplete, the uploaded scan is incomplete or cannot be clearly identified, it will be deemed as invalid certificate.
4. Obtaining Bidding Documents
4.1 The time for obtaining bidding documents is: December 29, 2018 to January 7, 2019;
4.2 Method of obtaining bidding documents: Bidders use "Jiangsu CA Digital Certificate" to log in to "electronic bidding and bidding trading platform" to obtain;
The "electronic bidding and bidding trading platform" in this bidding announcement and bidding document refers to: Lianyungang Public Resource Trading Center Network;
4.3 The bidding documents are priced at 300 yuan each and are non-refundable.
5. Bid deadline
5.1 The deadline for submission of bids is: 09:00 on January 16, 2019.
5.2 Tenderers shall not accept the bid documents delivered after the deadline.
6. Qualification review The qualification review is conducted by the post-qualification review method. For the qualification review standards, please refer to Chapter 3 of the bidding documents.
7. Bid evaluation method □ Comprehensive evaluation method □ Lowest bid price method after evaluation ■ Reasonable low price method, please refer to Chapter 3 of the bidding documents for the evaluation standard and method.
8. Media to publish the announcement The announcement of the bidding will be released on the Jiangsu Construction Engineering Bidding Network and the Lianyungang Public Resource Trading Center.
9. Contact information Bidder: Lianyungang Hi-tech Industrial Development Zone Bidding agency: Jiangsu Zhongrun Engineering Construction Consulting Co., Ltd. Nancheng Street Office
Address: No. 156, Xinjie Street, Nancheng Street Address: No. 37 Julong South Road, Lianyungang City Contact: Shen Gong Contact: Zhu Gong Telephone: 18360681308 Telephone: 0518-85450099

December 29, 2018

10. Instructions for the use of bidding documents
The bidder (s) shall use the model text format stipulated by Lianjianzhaoban [2018] No. 2 when preparing the pre-qualification (application) documents and bidding (investment) documents.
Bidders (bidding agencies) please download the bidding (qualifications) from the “Tendering Agent Login” section of Lianyungang Public Resources Trading Network (website: http://153.99.120.98:88/lygnet_hy/HuiYuanInfoMis_LYG/Pages/SSO/login.aspx) (Pre-review) file authoring tools and drivers.
Bidders please download the bid (pre-qualification application) document preparation by going to the "Bidder Login" section of Lianyungang Public Resource Trading Network (URL: http://153.99.120.98:88/lygnet_hy/HuiYuanInfoMis_LYG/Pages/SSO/login.aspx) Tools, and download CA lock driver, CAD control and other applications, used to open the bidding documents and make bidding documents.
Both Cathay New Point and Guanglianda's bidding document production tools have been linked to the Lianyungang City Public Resources Trading Version 5.0 bidding system platform, and bidders can choose to use it. If you encounter software problems during the bidding process, you can contact the corresponding software company for technical support. Contact as below:
Software company name contact phone Guanglianda Zheng Lei 13812332568?
Liu Shudan 18651253807

Cathay New Point Huang Guisong 15896100880
Zhu Jiawang 18905137238
Zhang Hainan 18505182641

four, announcement

1.Announcement time:    2019年01月07日 December 29, 2018 to January 07, 2019

2. Place of announcement:    Lianyungang Public Resource Trading Center Network

Fives, Obtaining Bidding Documents

Get time    2019年01月07日 December 29, 2018 to January 07, 2019

2. Get a location    Lianyungang Public Resource Trading Center

3. Price of Bidding Documents:    300.00 元每标段。 Each set is priced at RMB 300.00 per bid.

six, other instructions
Seven, Media making announcements

江苏建设工程招标网 连云港市公共资源交易中心网 上发布。 The tender announcement was also published on the Lianyungang Public Resource Trading Center of Jiangsu Construction Project Bidding Network .

Eight, contact details
Tenderer: Nancheng Sub-district Office, Lianyungang High-tech Industrial Development Zone Bidding Agency: Jiangsu Zhongrun Engineering Construction Consulting Co., Ltd.
Address: Address:
Postcode: Postcode:
Contact person: Shen Yan Contact person: Chen Fangfang
Telephone: Telephone: 85450099
Fax: Fax:
Email: Email:

In accordance with the principles of objectivity, fairness, and openness, this article of information was entrusted by the owner to be exclusively designated to be published on the China Construction Tendering Website qdmptop.com

More Jiangsu Procurement Information

Jiangsu Public Trading Center Jiangsu Bidding and Procurement Network Jiangsu Bidding and Tendering Network Jiangsu Bidding Information Network Jiangsu Government Procurement Center Jiangsu Water Conservancy Engineering Information Network Jiangsu Construction Trading Center Jiangsu Construction Bidding Network Jiangsu Construction Bidding Engineering Network Jiangsu Equipment Trading Center Jiangsu Construction Engineering Trading Center Jiangsu Public Resources Trading Center Jiangsu Unicom Purchasing and Bidding Network Jiangsu Mobile Purchasing and Bidding Network Jiangsu Telecommunications Purchasing and Bidding Network Jiangsu Bidding Agency Co., Ltd. Jiangsu Purchasing and Bidding Network Jiangsu Centralized Pharmaceutical Machinery Procurement Network Jiangsu Pharmaceutical Centralized Purchasing Website Jiangsu People's Hospital Bidding Information Jiangsu Government Procurement Network Jiangsu Bidding Network Jiangsu Engineering Bidding Network Jiangsu Cost Information Network Jiangsu Pharmaceutical Centralized Purchasing Network Jiangsu Construction Engineering Bidding Network Jiangsu Electric Power Bidding Network Jiangsu Public Resource Trading Network Jiangsu Mining and Bidding Network Jiangsu Bidding and Purchasing Network Jiangsu Bidding Supervision Network Jiangsu Human Resources and Social Security Network Jiangsu Procurement Network Jiangsu Procurement Information Network Jiangsu Building Materials Network Jiangsu Bidding Office Jiangsu Municipal Engineering Information Network Jiangsu Engineering Trading Center Jiangsu Taxation Bureau Jiangsu Education Bureau Jiangsu Finance Bureau Jiangsu Government Affairs Network Jiangsu Examinations Institute

Registered members enjoy caring services

Beacon inquiry service

Let you have a comprehensive and timely grasp of the project information of the provinces and cities across the country to be constructed, submitted for approval, approved, and under construction.

To help you with detailed contact information for the right project, find the right person in charge, and comprehensively master the project owner unit, design institute, general contractor unit, project manager, and project leader of the construction enterprise.

Help you get the information of the bidding and winning projects released by the project owners, bidding agencies and government procurement centers of the country.

Beacon Custom Services

Customize the project according to your focus, select the projects that meet your requirements and standards from a large number of projects, and find out the key person in charge and contact information in time.

According to your needs, timely feedback the progress of the project to your designated mobile phone and e-mail.

Consulting Hotline: 010-010-68368810, 010-82929830